PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed junction boxes at the 1st floor cmu wall Intake Room.jpg Laying out block at the 1st floor Sally ports Facing West 1.jpg Laying out block at the 1st floor Sally ports Facing West.jpg Preping the Electrical Room slab Facing North-West.jpg Welded steel plate at 2nd floor column line E.jpg Metal furing the 2nd floor shear wall Elev. 5,6 Facing North.jpg Welded steel plate at 3rd floor column line E.jpg
Previous pageNext page Laying out block at the 1st floor Sally ports Facing West
Laying out block at the 1st floor Sally ports Facing West